Home » Imondi » IMONE19N
 
Solid Wood Oak Laminate Engineered Flooring
Solid Wood Oak Laminate Engineered Flooring
Monday - Friday 9.00am - 5.00pm.
Saturday 9.00am - 1.00pm

UK Flooring Direct Ltd
Unit 1-5 Croft Mead
Ansley Village
Nuneaton
Warwickshire
CV10 9PX

Company Reg No. 5542003
VAT No. 874 1269 08

Tel No. 0845 263 6586
Fax 02476 397828

All Prices Are Exclusive Of VAT @ 15%
visa


Imondi Engineered Oak Bologna Brushed & Oiled

Imondi Engineered Oak Bologna has a width of 189mm (7.5") is 19mm in thickness and comes in standard lengths of 1860mm. The 4mm oak wear layer has been brushed to remove some of the softer summer growth rings from the grain. this gives an naturally textured surface that gently highlights the natural grain structure, some knots and shakes have been roughly filled to give the floor a distressed look. The surface is then finished with a protective Osmo natural oil coating. Each tongue and grooved plank has bevelled edges on all four sides and can be installed as a floating floor, fully glued down or nailed down. This floor is ideal for those who are looking for a solid floor but want the stability and benefits of engineered flooring. Refundable Sample available on this product.

sale.jpg
Reduced From: £69.95 m2
January Sale: £39.50m2
Pack Price: £83.34
Refundable Sample or Pack:

No. of packs: 
Item Ref: IMONE19N
Status: In Stock

Get an Installation guide
imondilogo.jpg
     
  Imondi Engineered Oak Bologna Brushed & Oiled<br><br>  
     

Quick Quote

Pack Size: m2
Please enter the dimensions of the area to be covered:
Width (lineal metres)
Length (lineal metres)
or if you already know the square metre size of your room then enter it below: m2
Calculate
To cover this room will require
pack(s)
Sub Total:
VAT:
Total:
Species:Oak
Finish:Brushed & UV Oiled
Flooring Construction:Engineered (Plywood Core)
Grade:Rustic
Style:Plank
Dimensions:19mm Thickness x 189mm Width x 1860mm Lengths
Installation:Floating (T & G PVA Glued) or Full Stick Down or Nailed Down
Warranty:25 years
Edge Detial:Bevelled Edges 2 Long Sides
Pack Size:2.11m2
Price Per Square:£39.50m2
Underfloor Heating:Yes
Est Delivery Time:72 Hours
Reduced From:£69.95 m2

Room Suitability

  • Suitable for Kitchen
  • Suitable for Lounge
  • Suitable for Conservatory
  • Suitable for Dining Room
  • Suitable for Utility Room
  • Suitable for Bedroom
  • Suitable for Office
  • Suitable for Hallway
  •      
      Imondi Engineered Oak Bologna Brushed & Oiled<br><br>  
         
     
  spacer  
     

Imondi Engineered Oak Bologna Brushed & Oiled Installation Guide

Engineered floors are very dimensionally stable allowing them to be installed over most types of sub floors. They are suitable for all areas of the house except bathrooms and wet areas. They are also suitable for use over underfloor heating. Imondi Engineered Oak Nuovo Brushed & Oiled can be installed as either a floating floor or by full glue down.

Tongue & Groove Floating Installation

Floating Installation is the most common and DIY friendly installation method because it is the easiest and the fastest to do, can be installed over any type of subfloor and it does not require any special skills or prior experience in installing floors. Tongue & groove floors are fixed together by running a bead of PVA glue down the groove and knocking into the tongue of the next board.

All flooring installations must use an approved underlay. Over a concrete subfloor you will need to use and underlay which has a built in damp proof membrane like Barrier Plus, while over a wooden subfloor you can use the standard Barrier underlay. For installations over underfloor heating we recommend using Tuplex underlay.

You will need to leave a 10mm expansion gap around the perimeter of the room. To maintain this gap during installation spacers are provided in the installation kits (purchased separately). After you have installed the floor you can cover this expansion gap with scotia / beading or new skirting boards The 10mm expansion gap also needs to be left in doorways where the floor follows through from one room to another; we have a full range of door profiles available to match your floor.

Full Glue Down Installations

Glue-down installation requires the use of an adhesive applied directly onto the subfloor and can be laid onto both concrete and wooden subfloors.

If you are laying over a concrete subfloor you will first need checked the concrete moisture, if the floor has a moisture content of over 4% then either wait until the sub floor dries to meet this level or use an appropriate moisture barrier, we recommend Mapeproof ESM to ensure no damp rises up into your new floor. To ensure a correct bond of the Adhesive to the wood floor and also the concrete subfloor we always recommend using the Mapeproof ESM

Also note that new concrete slabs require a minimum of 60 days drying time before covering them with a wood floor.

All Concrete sub-floors must be dry, smooth, level and free of structural defects. If the concrete sub floor is uneven we recommend using a self leveling compound to level the subfloor out. The concrete must also be free of paint, oil, existing adhesives, wax grease, dirt and curing compounds. These may be removed chemically or mechanically, but do not use solvent-based strippers under any circumstances. The use of residual solvents can prohibit the satisfactory bond of flooring adhesives. It is important to ensure a proper bond between the adhesives and concrete and wood panels.

If you have a wooden subfloor you will need to lay a 1/2" plywood base over this before installation, this will then give you a smooth and level surface for you to install you wood flooring onto.

Another important consideration in using glue-down installation is your choice of adhesives as some are only suitable for floors up to a small width. To avoid warranty issues and the possibility of future problems we recommend Mapei Ultrabond P990 1K which is used to fully bond the floor down or Mapei Ultrabond P990 1K Sausage which is used to bond the floor down with the use of an applicator gun to run beads of adhesive on the subfloor at 150mm intervals.

You will need to leave a 10mm expansion gap around the perimeter of the room. To maintain this gap during installation spacers are provided in the installation kits (purchased separately). After you have installed the floor you can cover this expansion gap with scotia / beading or new skirting boards The 10mm expansion gap also needs to be left in doorways where the floor follows through from one room to another; we have a full range of door profiles available to match your floor.

The above is a brief guideline on the installation of engineered flooring, always refer to the manufactures installation guidelines contained within packs of floor. View Manufactures Installation Guides.

ATTENTION – INSTALLER/OWNER RESPONSIBILITY

Inspect all materials carefully before installation. Wood is a natural product containing variations in colour, tone and graining. Some variation in colour is to be expected in a natural wood floor. Beautiful hardwood floors are a product of nature and therefore not perfect. These floors are manufactured in accordance with accepted industry standards, which permit a defect tolerance of 5%. Even though our product goes through many inspections before it leaves the plant, it is the responsibility of the customer and installer to perform a final inspection prior to installation. Any warranties offered with this product do not cover materials with visible defects once the product is installed.

JOB SITE CONDITIONS

It is the responsibility of the owner/installer to determine if the jobsite sub-floor and job site conditions are environmentally and structurally acceptable for wood floor installation. The installer/owner is responsible for wood failure resulting from or connected with sub-floor, subsurface, job site damage, deficiencies or using inadequate accessories after the hardwood flooring has been installed.

PLEASE NOTE:

Always read the full manufactures recommended installation guides before installation which you will find in every 3rd pack of flooring.

Maintenance Guide For UV Oiled Floors

In order to ensure lasting satisfaction from your new UV oil finished floor, it is important to correctly care for the floor starting immediately after installation. With the right care, the oiled floor will become increasingly easy to clean and more hard wearing over time. This is because the recommended soap used to clean the floor actually coats it with an invisible film, providing additional protection and thus making the floor more resistant to dirt. As well, the floor can be re-oiled as part of a regular maintenance program thus ensuring a lifetime of use and enjoyment.

After-Installation Care

All UV Oiled floors are recommended to be finished with WOCA Maintenance Paste right after installation and before the floor is used. As a result of this the surface will then be more hardwearing and be easier to clean and maintain in the future.

Normal Basic Cleaning

Normal cleaning to remove surface debris is accomplished using a broom or vacuum cleaner. To remove normal stains and non-loose dirt, the floor should be cleaned with water and a hard-wrung, wet cloth. In order to achieve the best cleaning possible use WOCA Natural Soap Cleaner. This soap is added to the water in a 40:1 solution. WOCA Natural Soap has two functions: it cleans the floor and at the same time forms an invisible, protective film on the surface of the floor making it even more resistant to damage from dirt. It is very important to use two buckets when cleaning the floor- one with the WOCA Natural Soap mixed solution and one with clean water for rinsing the dirty cloth or mop. Immerse the cloth or soft mop in the Soap solution, and then wring out the excess fluid before wiping the floor. Rinse the cloth or mop in the clear water, wring out the excess water, then immerse in the Soap solution again. Repeat this pattern until the floor is clean. Do not pour the Soap solution directly on the floor but instead, always use a cloth or mop to apply the solution.

Cleaning Extremely Dirty Floors

If the floor has been neglected and/or becomes very dirty, it should be cleaned using WOCA Intensive Wood Cleaner. This is added to water in a 40:1 ratio, following the guidelines above. Immediately after cleaning with the Intensive Cleaner, the floor should then be cleaned with WOCA Natural Soap (as above) in order to restore the protective soap film then finished with WOCA maintenance Paste.

Spot Remover

Difficult spots can be removed with WOCA Spot Remover. The Spot Remover is sprayed on the spot and left in place until the stain is dissolved, repeat treatment if necessary. The area is then cleaned and re-oiled with WOCA Maintenance Paste.

We recommend that you purchase a WOCA UV Oiled Maintance Kit with your floor.

Each kit contains

1.0 liter Natural Soap Concentrate (Will cover 350m2)
1.0 liter Intensive Wood Cleaner (Will cover 200m2)
400ml Maintenance Paste (Will cover 100m2)
1 Polishing Pad and 1 Cloth.

SSL