Life Bamboo Strand Woven Bamboo Carbonised Solid Flooring is a beautiful bamboo flooring product with a deep, rich caramel brown shade, reflecting the carobonisation process and its construction method. Strand Woven bamboo is a popular new flooring trend, combining fresh new designs with pure strength as strand woven bamboo is one of the toughest flooring materials on the market.
As a strand woven bamboo, the product is very hard and resilient, with the process involving stripping the material into strands and then boiling out the sugar, before it is pressed together with low VOC adhesive for a floor with twice the density of normal bamboo.
The floor is marked by a number of lines and characteristic nodes, unique features to bamboo and ones sure to make the floor stand out.
Each plank has bevelled edges on all four sides and these V-grooves give the product extra depth and dimension, while the floor is finished with a durable satin lacquer, which gives it an attractive light-reflective sheen.
It also provides extra protection for the floor and makes cleaning and maintenance easier.
| Room Suitability |
|
| Environmental Benefits |
|
| Species | Bamboo |
| Construction | Solid |
| Thickness | 14mm |
| Lengths | 1830mm |
| Width | 96mm |
| Edge Detail | 4v Bevell |
| Style | Strand Woven |
| Profiling | Tongue & Grooved |
| Finish | Lacquer |
| Timber Source | North Asia |
| Product Origin | North Asia |
| Wear Resistance | Very Heavy Domestic |
| Load Bearing Floor | No |
| Installation Methods | Nail/Screw Down, Glue Down, T & G Glue |
| Residential Warranty | 30 Year |
| Species | Bamboo |
| Shade | Medium |
| Colour | Brown |
| Finish | Satin Lacquer |
| Grade | Rustic Nature Family |
| Thickness | 14mm |
| Width | 90mm - 120mm |
| Style | Plank Plank V Grooves Strand Woven |
| Installation | Nail/Screw Down T & G Installation Full Glue Down Fast Fit Peel & Stick |
All solid wood flooring can react to the presence of moisture. In the winter when the home has the central heating on, moisture can leave the wood, while in the summer months when the humidity is higher, the wood will absorb moisture, this is all a natural process.
Nearly all problems related to solid wood flooring are due to improper installation and exposure to excessive moisture in the concrete sub floor or hummidity. If there is too much moisture it will cause the wood planks to cup, or buckle. This is why it is important when installing that you follow the correct recommended installation methods.
On concrete sub-floors we always recommend to install a surface DPM (damp proof membrane) such as Mapeiproof ESM prior to installation, this applies to both new and old floors.
Also note that new concrete slabs require a minimum of 60 days drying time before covering them with a wood floor, please always test the moisture of a new concrete sub-floor in several random places to ensure it is suitable to be laid on.
Prior to installation a solid wood flooring must be acclimatised to reach its equilibrium. The product should be left in the room it is going to be laid in at normal room temperature for 10-14 days prior to installation.
Solid Bamboo Floors can be installed several ways:
Fully Glued Down Installations
All Concrete sub-floors must be dry, smooth, level and free of structural defects. If the concrete sub floor is uneven we recommend using a self levelling compound to level the subfloor out. The concrete must also be free of paint, oil, existing adhesives, wax, grease, dirt and curing compounds. These may be removed chemically or mechanically, but do not use solvent-based strippers under any circumstances. The use of residual solvents can prohibit the satisfactory bond of flooring adhesives. It is important to ensure a proper bond between the adhesives and concrete and wood panels.
You can nail down a solid bamboo floor over a concrete subfloor with the use of battens. A damp proof membrane sheet must first be laid over the concrete subfloor before the battens are laid out at centres of 450mm. The battens must be a minimum of 40mm in depth to avoid them bowing. The solid bamboo floor can then be nailed down as described below.
Another important consideration in using glue-down installation is your choice of adhesives as some are only suitable for floors up to a small width. To avoid warranty issues and the possibility of future problems we recommend Mapei Ultrabond P990 1K which you trowel out to fully bond to the subfloor. Alternatively you can use Mapei Ultrabond P990 1K Sausage adhesive which is applied with an applicator gun to run beads of adhesive on the subfloor at 150mm intervals, this is easier for DIY
Floating On An Adhesive Backed Underlay
You can also install a solid bamboo flooring over a concrete subfloor by floating it on an adhesive backed underlay such as Fast Fit Peel & Stick Underlay, this has adhesive on one side which the solid wood floor is laid onto. Before you lay down the underlay you will need to first lay a 1000 gauge sheet of damp proof membrane
Nailed Down Installations
Nailed down installation is the traditional way to install solid bamboo floors and can be done either directly onto wooden subfloor or on a concrete subfloor with the use of battens.
Solid bamboo floors can be nailed into existing wooden subfloors such as floorboards or plywood but not into chipboard floors as these are not strong enough to hold the nails. The floorboards must be in good condition and level if not it is advisable to lay 1/2" plywood down first.
When you nail down a solid bamboo floor you use a Porta-Nailer to drive a nail at a 30 degree angle through the tongue and into the subfloor. Porta-Nailers can be hired from any good hire shop.
A new alternative to this is the new Elka Tongue Tite Screws these have been specially designed for use with tongue & groove wood flooring. Each pack covers 10m2 and comes with a special drill bit that fits any standard electric drill or screwdriver.
Installing onto Battens
You can nail down a solid bamboo floor over a concrete subfloor with the use of battens. A damp proof membrane sheet must first be laid over the concrete subfloor before the battens are laid out at centres of 450mm. The battens must be a minimum of 40mm in depth to avoid them bowing. The solid bamboo floor can then be nailed down as described above.
This is a brief guide on installation solid bamboo flooring always refer to the manufactures installation guides in the packs of the flooring.
If you require any further advice on installation then please call our technical department on 0845 263 6586, e-mail us on info@ukflooringdirect.co.uk or click the Live Help Button at the top of the page.
Life Bamboo Strand Woven Bamboo Carbonised Solid Flooring Maintenance Guide
In order to ensure lasting satisfaction from your new lacquered floor, it is important to correctly care for the floor starting immediately after installation. With the right care, the lacquered floor will maintain a fresh, clean new looking surface with a subtle sheen.
All the products related to maintaining this flooring will be available to purchase at very competitive prices after you have selected your flooring and added to the basket.
General After-Care Cleaning
Normal cleaning to remove surface debris is accomplished using a broom or vacuum cleaner. To remove normal stains and non-loose dirt, the floor should be cleaned with the Easy Clean Lacquered Flooring Cleaning Spray. This easy to use spray is ideal for hectic homes which need a quick cleaning solution - simply spray evenly across the floor, allow a minute to work on any stubborn marks and simply mop over. We recommend the use of the Easy Care Aluminium Micro Fibre Mop.
Cleaning Extremely Dirty Floors
If the floor has been neglected and/or becomes very dirty, it is advise to use the Easy Clean Lacquered Flooring Intensive Cleaner. Simply dilute 1 cap to 2l of warm water and apply with the Easy Care Aluminium Micro Fibre Mop. After allowing the solution to work on the dirt simply go over the area again removing the solution and the dirt from the floor - for stubborn marks repeat this process.
Refreshing Your New Floor
To keep the floor looking new it is recommended to use the Easy Clean Lacquered Flooring Refresher, this prevents dust build up, adds antistatic and anti-slip properties as well as restoring the floor to its original sheen. Prior to application it is reccomended all loose dirt is swept and removed from the surface followed by using the Easy Clean Lacquered Flooring Intensive Cleaner to ensure the refresher is applied directly to the flooring surface and not layered ontop of any stubborn dirt, ensuring the best results.
As a ready solution this is ideal to quickly refresh your flooring and to maintain that new look, this is recommended 2-3 times per year dependant on wear and foot traffic.
All the products related to maintaining this flooring will be available to purchase at very competitive prices after you have selected your flooring and added to the basket.
If this does not answer all of your questions or you wish for some further advise please do not hesitate to contact us.