Wednesday 19th Jun 2013

Ask the expert

Acclimatisation period

May 30th, 2012

Q: I was looking at the engineered floors. Does it need to be left in the room to acclimatize before laying ? If yes for how long?

A: UK Flooring Direct always recommend a minimum acclimatisation period, in the room to be installed, of between 5-7 days dependent on inside and outside conditions.

Tags